
Bramleyman
|
Engineering WorksWHEN are we going to see an end to all this?
Every day of the week now, apart from the bridge just outside Ely, there is Engineering work going on between Ely and Norwich, with BUSES replacing trains all week and for goodness knows how long.
To add to this, there is a BUS replacement service between Ely and Peterborough at weekends, much to the delight of motorists crossing the level crossings that aren't having work carried out on them.
|
nebulaman
|
The track is shot and there has been speed restrictions on the track for a while. Hopefully will all be a thing of the past soon. Original work was set to last 8 days.
|
|
|
|